Customized Parts CNC Machining Service Steel Aluminum Forging Custom Machining for Machinery

Still deciding? Get samples of $ !
Request Sample

Product Description

Basic Information
Model NO.
DH-2505062
Surface Treatment
Polishing
Production Type
Batch Production
Machining Method
CNC Turning
Material
Steel, Brass, Alloy, Copper, Aluminum
Transport Package
Plywood Case
Specification
Customized
Origin
China
HS Code
8479909090
Production Capacity
500,000 PCS/Year
Product Description
Custom Forged Parts

Our custom forged components are foundational elements of durability and reliability in your most critical applications. We specialize in transforming raw metal into high-strength, precision-engineered parts tailored to your exact specifications. Whether you're in aerospace, automotive, heavy machinery, or energy, we provide the structural integrity your projects demand.

Custom Forged Parts
CNC Machining Service
Key Features & Advantages

1. Unmatched Strength & Durability: The forging process aligns the metal's grain structure to the shape of the part, resulting in superior strength and resistance to impact and fatigue compared to casting.

2. Precision Customization: We work with your blueprints or CAD models to create forged parts that meet precise dimensional and tolerance requirements.

3. Material Versatility: Available alloys include Carbon Steel, Alloy Steel, Stainless Steel, Aluminum, Titanium, Brass, and Copper.

4. Superior Structural Integrity: Forging eliminates internal voids and porosity, ensuring consistent mechanical properties and enhanced reliability.

5. Cost-Effectiveness: For high-volume production, custom forging minimizes material waste and reduces the need for secondary machining.

Forging Process
Industrial Applications
Technical Specifications & Process

Processes: Open-Die Forging, Closed-Die Forging, Free Forging, Precision Forging.

Tolerances: Adherence to international standards (ISO, ASTM, ASME) with tight tolerances to minimize finishing work.

Post-Forging Services: Heat treatment (annealing, quenching & tempering), machining, surface finishing, and NDT testing.

Common Applications & Industries

Automotive: Crankshafts, connecting rods, axle beams.

Aerospace: Landing gear, turbine disks, flight control actuators.

Oil & Gas: Drill bit bodies, valve bodies, flanges.

Heavy Machinery: Excavator components, gear blanks, crane hooks.

Main Products
Product Catalog 1 Product Catalog 2
Manufacturing Profile
Facility Overview

Based in Luoyang, a historical industrial hub, we have been specialized in the forging industry for over 20 years. Our focus is the design and production of high-quality industrial parts, auto components, and special alloy forgings. Serving industries from railway to petrochemical, we provide comprehensive mechanical parts design and professional production processes.

Workshop & Production Process
Production Workflow
Certifications
Quality Certifications
Exhibition & Global Customers
Exhibition 1 Exhibition 2 Customer Visit
Packing & Delivery
Packaging Details
Frequently Asked Questions
1. What is the typical lead time for samples and production?
Pattern creation takes 30-45 days, and samples are typically ready 30 days after the pattern is finished. For mass production, the standard lead time is 90 days after sample approval.
2. What is your new product development process?
The process includes a project kickoff meeting, mold/fixture design and in-house manufacturing, material procurement, precision machining, rigorous inspection, and final sample delivery with an inspection report.
3. How do you ensure product quality?
We implement APQP at the start of every project. Our quality control team performs patrol inspections during manufacturing and a 100% final inspection before packing and dispatch.
4. What are the standard payment terms?
Initial orders usually require a 50% deposit for tooling. Production orders typically involve a 50% deposit with the balance due via T/T before shipping. Terms are negotiable for long-term partners.
5. How long does international shipping take from China?
Sea freight to Europe takes approximately 6-7 weeks (including customs). Shipping to the US East Coast takes about 2 weeks, and the West Coast takes about 3 weeks. Air freight typically takes 7 days globally.
6. Is there a minimum order volume?
There is no strict minimum volume, but higher volumes are more economical due to the fixed costs of importing and manufacturing setups.

Related Products